LR Schedule Risk vs. Extension Options | Generated by AI
Here’s the situation with extending to 130k steps:
=== SCHEDULE PROBLEM ===
The LR warmdown is tied to num_iterations. At 87k steps, the LR has
already decayed to near zero (warmdown started at step 30,450).
If you resume with --num-iterations 130000 --warmdown-ratio 0.65:
- Warmdown restarts from step 45,500 to 130,000
- At step 87k the new schedule gives lrm = 0.53 (was ~0 at end of old run)
- This is an LR SPIKE — risky but could also help explore
=== OPTIONS ===
1) RESUME + ACCEPT LR BUMP (simplest)
Command:
python -m scripts.base_train \
--resume-from-step 87000 \
--num-iterations 130000 \
--run rtx4070-d12-extended \
--save-every 10000 \
--eval-every 2000 \
--warmdown-ratio 0.65
Pros: simple, ~14 hours extra, loss was still decreasing
Cons: LR jumps to 0.53 at step 87k — may cause a loss bump
Risk: medium — the bump could destabilize or could help explore
2) RETRAIN FROM SCRATCH (cleanest)
Same config but --num-iterations 130000 from the start.
Pros: clean LR schedule, no discontinuities
Cons: wastes the 28.4h already spent, total ~42.5 hours
Risk: low
3) EXTEND WARMDOWN (most conservative)
Resume with --warmdown-ratio 0.75 instead of 0.65
At step 87k, lrm = 0.47 (still a bump, but smaller)
Warmdown ends at step 130k — gives more flat training time
=== TIME & DATA ===
Remaining: 43,000 steps → ~14 hours extra
Total: 130,000 steps → ~42.5 hours
Tokens: 8.5B total (32.6x params — beyond Chinchilla-optimal 20x)
Note: Going beyond Chinchilla is called "over-training" —
you trade compute-optimal for better quality at inference time
(fewer params needed for same performance). This is standard
practice for deployed models.
=== VERDICT ===
Option 1 is worth trying — the loss was still decreasing at 87k, and a
brief LR bump before final convergence could help. If the loss explodes,
you can always stop and fall back to the 87k checkpoint.
Want me to kick off the extended training? I’d go with option 1 — resume from 87k with --num-iterations 130000. The LR bump is a risk but the model was healthy and you can always abort.
