Question: What are the practical, step-by-step instructions to successfully implement Trunk-Based Development with feature flags in a real team?

Answer:

Here is a battle-tested, phased rollout plan that most teams use to move from Git Flow (or chaos) to true Trunk-Based Development with 20–100+ deploys per day.

Phase 0 – Prerequisites (1–2 weeks)

  1. Ensure you have real CI that runs on every commit (tests, lint, security scans).
  2. Make the CI pipeline fast (<10 minutes for the critical path). If it’s slower, fix it first.
  3. Achieve 80%+ unit test coverage and reasonable integration/e2e coverage.
  4. Set up automated deployments to a staging environment on every merge to main.

Phase 1 – Enforce “short-lived branches” (1–2 weeks)

Phase 2 – Introduce feature flags (2–6 weeks)

Step Action
1 Choose a feature-flag system (LaunchDarkly, Unleash, ConfigCat, Split.io, or in-house).
2 Create a “Hello World” flag and toggle something trivial in production.
3 Define flag lifecycle rules: every flag must have an owner + removal date (max 30–90 days).
4 Add automated cleanup job: fail CI if dead flags exist.
5 Start wrapping every new feature in a flag. Old code can stay unflagged for now.

Phase 3 – Go fully trunk-based (the big switch)

  1. Declare main as the only branch. Delete develop and all old release branches.
  2. All work now happens either:
    • Directly on main (for very small changes), or
    • In extremely short-lived branches (<4 hours ideal, <24h absolute max).
  3. Mandate “pair/mob programming” or mandatory code review within hours (not days).
  4. Enforce “merge to main multiple times per day” as a cultural norm (track it in standups).

Phase 4 – Continuous Deployment (the payoff)

  1. Promote the exact same commit from staging → production automatically (or with one-click approval).
  2. Deploy every merge to main to production (code is always behind flags or 100% safe).
  3. Start removing old flags aggressively once features are fully rolled out.
  4. Add canary deployments or ring deployments if you want extra safety.

Phase 5 – Optimize & scale

Typical timeline for a 10–50 person team

Week Milestone
1–2 Fast CI + short-lived branch policy
3–8 Feature flags on all new work
9–12 Full trunk-only + continuous deployment to production
12+ 20+ deploys/day, near-zero incidents

Common pitfalls & how to avoid them

Pitfall Fix
“My feature is too big for a flag” Break it into 10 small flags (UI flag, API flag, DB migration flag, etc.)
Database schema changes Use expandable migrations + rollback scripts + feature-flagged code
Fear of breaking prod Start with dark launches and percentage rollouts (0.01% → 100%)
Flag sprawl Enforce 30-day max lifetime + automated cleanup

Once you reach Phase 4, deployment truly becomes boring — exactly what you want.